Senior Systems/Project Engineer; Air Traffic Management

Vacancies 08 August 2019

At Saab, we constantly look ahead and push boundaries for what is considered technically possible. We collaborate with colleagues around the world who all share our challenge – to make the world a safer place.

Closing date

02-Dec-2019

Location

Syracuse, NY

Contact

Apply for job!

What you will be part of

Saab Traffic Management (TM) serves air traffic and marine customers around the globe with advanced solutions that enable the safe and efficient movement of people and goods. There are two operating units within TM: Air Traffic Management (ATM) provides airport surface safety and efficiency systems and tools, tower automation and advanced research, development and evaluation solutions; Maritime Traffic Management (MTM) solutions include Automatic Identification Systems (AIS), port and vessel traffic management information systems (VTMIS), hydrographics, and precision navigation.

Aviation stakeholders face a greater number of challenges and more complex demands than ever before. At Saab Air Traffic Management (ATM), we continually find new ways to address these challenges and enable safe, predictable, and efficient operations. We go beyond existing solutions, pioneering new ideas and helping to set industry standards.

Saab ATM’s expertise spans operations, surveillance sensors, ATC automation, collaborative decision making, and digital towers. Our solutions are trusted by air navigation service providers, airports and airlines at over 100 locations in more than 45 countries. As a global leading partner and provider of proven ATM solutions and services, we transform operations, turning innovative ideas into reality and supporting stakeholders from solution conception through long-term support.

Your role

Saab ATM is seeking a self-motivated, experienced, enthusiastic Systems or Project Engineer interested in designing, deploying, integrating, tuning, and commissioning air traffic surveillance and automation systems as part of our Automation and Surveillance (A&S) team. This position offers opportunities to travel internationally, exercise a diverse range of practical engineering and professional skills, and interact with customers around the world.

Responsibilities and learning opportunities include:

  • Understand customer requirements, and develop system designs and architectures to satisfy those requirements.
  • Perform design analysis and trade studies.
  • Work within or lead small, interdisciplinary teams to develop detailed designs and technical and programmatic artifacts.
  • Develop technical documentation and presentation materials for design reviews.
  • Participate in or lead programmatic and technical discussions with customers.
  • Develop test methodologies, plans, and procedures for customer requirements.
  • Integrate, configure, and test systems in the factory and in the deployed environment.
  • Work collaboratively with customers, prime contractors, and subcontractors to integrate systems and subsystems.
  • Analyze and reduce large data sets to quantify system performance, investigate anomalies, and develop solutions.
  • Support proposal activities by analyzing requirements, assessing compliance/NRE, providing cost and schedule input, and providing/editing technical written material.
  • Utilize and improve existing Saab processes, policies, and products.

At Saab ATM, you will have the opportunity to make a direct impact on the deployment of state-of-the-art products that save human lives, provide improved travel experiences, and improve the environment. You will work closely with world-class engineers and professionals in an environment that fosters professional development, collaboration, and support at all levels. This position provides challenging and rewarding work, with many opportunities for growth.

Your experiences and skills

Required:

  • A bachelor's degree in engineering or a related discipline from an accredited institution; or relevant military education & training
  • Technical/project experience consistent with that of a senior engineer or technical professional (8+ years’ experience)
  • The ability to work effectively in a dynamic, fast-paced, team environment.
  • Strong interpersonal and teamwork skills.
  • Demonstrated personal time management, planning, and organizing skills.
  • Technical project planning skills (including providing cost and schedule estimates).
  • Drive to take ownership of and responsibility for major tasks and programs.
  • Strong analytical thinking and problem solving skills.
  • Ability to identify, understand, and manage risks proactively.
  • The knowledge of or technical background to learn the theory of operation, design, and optimization processes for air traffic surveillance and automation products.
  • The ability to understand customer requirements and develop system-level architectures and integration & test strategies to ensure these requirements are satisfied.
  • The ability to effectively communicate (written and verbal), present to, and collaborate with both technical and non-technical colleagues and customers.
  • The ability to generate high-quality technical documentation, including architecture documents, test plans and procedures, reports, and white papers.An interest in international travel and the ability to work with technical counterparts from different countries and cultures around the world.
  • Computer programming in a high-level language such as Matlab, C/C++, Java, etc.

Desired:

  • Knowledge of air traffic surveillance systems
  • Familiarity with Linux
  • Familiarity with IP networks 

Travel: Opportunity for international travel (up to 30%)

Saab ATM provides an excellent working environment offering professional growth opportunities, competitive wages, comprehensive benefits, work/life balance, business-casual atmosphere, paid holidays, cafeteria and a fitness facility.

Must be a U.S. citizen, Permanent Resident (green card holder), or protected individual as defined by 8 U.S.C. 1324b(a)(3).

As a condition of employment, candidates will be required to participate in a background check that will include, at a minimum, a criminal record check, education and employment verification.

 

Saab is a global defense and security company operating in the fields of air, land and naval defense, civil security and commercial aeronautics. We number approximately 15,500 employees and have operations on all continents. Technologically we are leaders in many areas, and one-fifth of our earnings are spent on research and development.Saab is a company where we see diversity as an asset and offer unlimited opportunities for advancing in your career. We are also a company that respects each person’s needs and encourage employees to lead a balanced, rewarding life beyond work. Saab values diversity and is an Equal Opportunity/Affirmative Action employer. All qualified individuals are encouraged to apply and will be considered for employment without regard to race, color, religion, national origin, sex (including pregnancy), sexual orientation, gender identity, age, veteran, or disability status.

Apply for job!